Wednesday, July 28, 2004

ceilings, floors

Most of the ceiling has been installed on the fourth floor, and the light fixtures are going in.  The walls have been painted, and so has the ceiling of the elevator lobby and some of the trim.   There's a new group study room that's almost finished, and the Sidebar has a new look. 
Up on the fifth floor, the carpet has been completely installed and you can see the shape of the new "cyberbar". 

The new group study room


The Sidebar Cafe; note the cool curvy metal thing on the ceiling

No comments: