Today the workmen began installing a Dome where the hole in the ceiling used to be. It's made of white fiberglass and arrived in about a dozen sections. By lunchtime today, two of the sections had been installed.
Meanwhile, the framing of the fourth floor ceiling has been completed.
On the fifth floor, the central staircase is being painted.
The Dome is being installed
Painting of the central stairwell has commenced
No comments:
Post a Comment