The carpeting arrived for the fifth floor, and some of it was pieced and set in place. It's a nice neutral gray color with a textured pattern.
The ceiling on the fourth floor continues to be installed; most of the tiles around the perimeter are in place.
The Dome just before the last wedge was installed
The carpeting is ready to be installed on the 5th floor
No comments:
Post a Comment